Projects gallery

United Kingdom

The UK is where WorkForce was established and operates from, we’ve worked from England to Scotland to Wales and also offshore. Recently the team finished a project for the electrical engineering company- ASEE Ltd; constructing and carrying out the installation of fuel system lines for data centre facilities, the pipe work was fabricated and welded on the site in Slough. Other examples of our operations in the UK, would be when WorkForce developed the facilities of F1 team: Williams Racing. Our crew made bespoke modifications to the compound’s nitrogen pipelines, on behalf of our prestigious client: Highmark Welding Installations. Not to mention the contracts WorkForce completed within the food and beverage industry, recently the team fabricated, maintained, as well as upgraded the pipework for the British Sugar Factory, on behalf of another reputable client, Vogal Group.

Europe

We’ve had years of experience inside multiple EU countries and territories, with an outstanding history of successful projects. For example in Denmark, we fabricated and installed pipelines in a brand new factory owned by Air Liquid, as a subcontractor for Highmark Welding Installations. These pipelines transported a variety of gases both inert and flammable, notable ones being: nitrogen, helium, argon, and acetylene. Additionally, in the Netherlands (Rotterdam), WorkForce was part of a large cruise ship modification at Keppel Verolme shipyard- where the ship’s length was extended from its centre. The team was also responsible for constructing/installing  structural supports and pipelines for a new power station owned by the well established petrochemical company BASF, based in Antwerp, Belgium.

Rest of the World

Whilst WorkForce’s project record has been mostly in the EU, the team has also travelled to the Canary Islands and most recently to the Falkland Islands. At the Canary Islands we modified various sections of an oil drilling rig for Stena Drilling Ltd; from reinforcing the pontoons to light jobs like handrail and staircase upgrades. In the Falklands, WorkForce was invited by the renowned company Trant Engineering to finalise all mechanical works in the construction of a new power station- for the MoD’s RAF Mount Pleasant Complex. This project involved: high/low medium temperature water pipelines, fuel, lube and waste oil systems, RO water systems, installation of instruments and Swagelok systems and compressed air lines. These systems were fabricated and installed on site by our dedicated team.